Port of Seattle, SeaTac, WA
General Contractor: Turner
Contract Value: $669,795.00
Description:
4 Libeherr 630 Tower Cranes were erected by Apex. As the project evolved we re-configured the 4th crane JIB length using the 3rd tower crane and maximized the used of the mobile crane during the dismantle of TC #2.








