Million Dollar Bridge, Cordova, AK
General Contractor: Mowat Construction
Contract Value: $100,000.00
Description: Apex traveled to Cordova, AK to repair this bridge that crosses the Copper River. Originally built in the 1900’s Apex performed work underneath the existing bridge replacing barrier, drilled shaft, foundation, pier and pier cap – all while the bridge was in service.
