I-5 Everett HOV Design Build Project, Everett, WA

Photos: 1 | 2
General Contractor: Atkinson-CH2MHill
Contract Value: $168,000.00
Description: Apex erected the steel girders over I-5 in Everett during a 6 hour window when the freeway could be shut down. Working with two crews and two cranes, Apex erected and completed bolt up of this 10’ deep girder bridge during the overnight work shift.