Southcenter Mall Expansion
(image) |
| General Contractor: Bayley Construction |
| Description: 6,000 tons of Structural Steel in Renton for Bayley Construction. |
Harborview Medical Center IEB (image) |
| General Contractor: Turner Construction |
| Description: 2 stories of steel on top of a new 10 story concrete building. 2 super trusses spanning over 9th Ave. from the top of a new building to the top of the existing building with 9 floors hanging off the bottom trusses. All floors prefabricated on temporary bridge. An air hoist was used to place each level starting from the top down. |
C755 (image) |
| General Contractor: PCL Construction |
| Description: 1100 tons of Structural Steel in SeaTac for the Light Rail. |
Experience Music Project ( image
one, image
two, image
three) |
| General Contractor: Hoffman Construction |
| Description: Designed by Frank Gerry. There were over 1 Million
wire mesh welds and every sheet was hand fitted. |
Bethel High School (image
one, image
two) |
| General Contractor: Wick Constructors |
| Description: 220,000 square foot construction of a new high school
in Graham, WA. |
Stafne Residence (image
one, image
two) |
| General Contractor: Home Owner |
| Description: Erection of 50 tons of structural steel for a house
frame on top of a mountain. A log truck was used to deliver the steel. |
Museum of Flight (image
one, image
two) |
| General Contractor: Sellen
Construction |
| Description: Erection of 800 tons of structural steel with perimeter
columns designed to be 8 feet out of plumb. |
St. Joseph’s Hospital (image
one, image
two, image
three) |
| General Contractor: Sellen
Construction |
| Description: Erected 1300 tons of structural steel including 30
ton trusses which were erected during a weekend shutdown using an
Apex designed cable support system. |
Seahawks Stadium Art (image
one, image
two, image
three, image
four) |
| Contractor: 1st & Goal |
| Description: Erected all scoreboards and signboards. |
City Transfer, Inc., Processing Tower
(image
one, image
two, image
three ) |
| General Contractor: City Transfer |
| Description: Apex erected tower and placed processing equipment. |
DSHS (image
) |
| General Contractor: Capital Development |
| Description: Three-story office building. |
Overlake Hospital (image
) |
| General Contractor: GLY Construction |
| Description: One of two jobs using side plate engineering in the Northwest. |
Fred Hutchison Phase 4A (image
one, image
two) |
| General Contractor: Turner
Construction |
| Description: Erection of 700 tons of Structural Steel for a six-story
building. |
Compass Center (image
one, image
two, image
three) |
| General Contractor: Turner Construction |
| Description: Erection of a four story building set between two existing
buildings. Pre-fabricated 6 brace frames, used a crane with jib to
fly steel over existing three story building, and set all the brace
frames in less than one day. |
Lincoln Square (image)
|
| General Contractor: GLY
Construction |
| Description: 29 story Structural Steel Building in Bellevue, WA
with GLY Construction. Erection performed above five stories of occupied
space. Apex also erected a unique tower crane base designed by Morrow
Crane. |
C-1 100% Final Baggage Screening (image) |
| General Contractor: Turner Construction |
| Description: New TSA baggage handling facility at SeaTac Airport for Turner Construction. Apex did supply and erect of all Structural Steel and Miscellaneous Metals.
Apex also performed the erection of the tower crane. Total contract value of approx. $6 milion. |