Reinforcing Steel / Post-Tensioning Top of page

William Gates Hall (image)
General Contractor: Lease Crutcher Lewis
Description: Installation of 800 tons of reinforcing steel where all core walls were installed simultaneously.

112th @ 12th (image)
General Contractor: PCL Construction
Description: 20,000 sqare foot deck pours every four days.

Legacy Towers ( image one, image two, image three, image four)
General Contractor: JE Dunn
Description: Two 14-story condo towers.

Sultan Waste Water Treatment Plant (image)
General Contractor: Harbor Pacific Contractors
Description: Installation of steel for two clarifiers, one oxidation tank, and an operations building.

Howard Hansen Dam (image)
General Contractor: Hisey Construction
Description: Beef-up of the dam.

Redmond Water Tank (image one, image two)
General Contractor: T. Bailey
Description: Installed 75 tons in two days with a 5 man crew.

Washington Square (image one, image two)
General Contractor: Big-D Construction
Description: Two 20 story towers over six floor parking garage on a ten-acre site in Bellevue, WA for Big-D Construction. Apex was contracted under Conco Cement.
Bridge Top of page

 
NE 8th Pedestrian Bridge (image)
General Contractor: GLY Construction
Description: Pedestrian skybridge over NE 8th in Bellevue with GLY. 280' long, 12' tall, 20' wide with radius, weighing 300,000lbs. Less than 1' of clearance from existing buildings to get bridge in place.

I-5 Everett HOV Design-Build Project ( image one, image two)
General Contractor: Atkinson-CH2M Hill
Description: Erection of steel girders over I-5 in Everett WA.

Million Dollar Bridge ( image )
General Contractor: Mowat Construction
Description: With Mowat in Cordova, Alaska, Apex repaired a bridge damaged by the 1964 earthquake.

West Galer Street Flyover (image)
General Contractor: Atkinson Construction
Description: Reinforcing and Structural Steel for overpass in Seattle.

NE 8th Street Interchange (image)
General Contractor: Atkinson Construction
Description: Erection of 33 steel girders in six night shifts from 11 pm to 5am.

Green River Bridge (image)
General Contractor: Mowat Construction
Description: Four pairs of 210 foot long, 8 feet deep girders with a 4 foot radius, 2% slope, and a 12 inch camber weighing 325,000 lbs. Each pair was prefabricated by Apex and set in one day using a 850 ton Transilift. Apex performed the structural and reinforcing work.

Tacoma Narrows East Abutments ( image one, image two, image three, image four)
General Contractor: Malcolm Drilling
Description: 10' diameter shafts.

Machias Bridge (image)
General Contractor: Mowat Construction
Description: 260-foot long truss bridge that is also 50 feet wide and 45 feet tall, all galvanized erected over Machias River. Apex Steel completed all of the structural steel and the reinforcing steel.
Structural Steel Top of page

 
Southcenter Mall Expansion (image)
General Contractor: Bayley Construction
Description: 6,000 tons of Structural Steel in Renton for Bayley Construction.

Harborview Medical Center IEB (image)
General Contractor: Turner Construction
Description: 2 stories of steel on top of a new 10 story concrete building. 2 super trusses spanning over 9th Ave. from the top of a new building to the top of the existing building with 9 floors hanging off the bottom trusses. All floors prefabricated on temporary bridge. An air hoist was used to place each level starting from the top down.

C755 (image)
General Contractor: PCL Construction
Description: 1100 tons of Structural Steel in SeaTac for the Light Rail.

Experience Music Project ( image one, image two, image three)
General Contractor: Hoffman Construction
Description: Designed by Frank Gerry. There were over 1 Million wire mesh welds and every sheet was hand fitted.

Bethel High School (image one, image two)
General Contractor: Wick Constructors
Description: 220,000 square foot construction of a new high school in Graham, WA.

Stafne Residence (image one, image two)
General Contractor: Home Owner
Description: Erection of 50 tons of structural steel for a house frame on top of a mountain. A log truck was used to deliver the steel.

Museum of Flight (image one, image two)
General Contractor: Sellen Construction
Description: Erection of 800 tons of structural steel with perimeter columns designed to be 8 feet out of plumb.

St. Joseph’s Hospital (image one, image two, image three)
General Contractor: Sellen Construction
Description: Erected 1300 tons of structural steel including 30 ton trusses which were erected during a weekend shutdown using an Apex designed cable support system.

Seahawks Stadium Art (image one, image two, image three, image four)
Contractor: 1st & Goal
Description: Erected all scoreboards and signboards.

City Transfer, Inc., Processing Tower (image one, image two, image three )
General Contractor: City Transfer
Description: Apex erected tower and placed processing equipment.

DSHS (image )
General Contractor: Capital Development
Description: Three-story office building.

Overlake Hospital (image )
General Contractor: GLY Construction
Description: One of two jobs using side plate engineering in the Northwest.

Fred Hutchison Phase 4A (image one, image two)
General Contractor: Turner Construction
Description: Erection of 700 tons of Structural Steel for a six-story building.

Compass Center (image one, image two, image three)
General Contractor: Turner Construction
Description: Erection of a four story building set between two existing buildings. Pre-fabricated 6 brace frames, used a crane with jib to fly steel over existing three story building, and set all the brace frames in less than one day.

Lincoln Square (image)
General Contractor: GLY Construction
Description: 29 story Structural Steel Building in Bellevue, WA with GLY Construction. Erection performed above five stories of occupied space. Apex also erected a unique tower crane base designed by Morrow Crane.

C-1 100% Final Baggage Screening (image)
General Contractor: Turner Construction
Description: New TSA baggage handling facility at SeaTac Airport for Turner Construction. Apex did supply and erect of all Structural Steel and Miscellaneous Metals. Apex also performed the erection of the tower crane. Total contract value of approx. $6 milion.
Pre-cast Top of page

 
Harborview Medical Center IEB (image)
General Contractor: Turner Construction
Description: 750 pre-cast panels

Mount Si Field Improvements (image one, image two)
General Contractor: Berschauer Phillips Construction
Description: With Berschauer Phillips in North Bend, Apex placed rebar and mesh, erected pre cast, structural steel and miscellaneous metals. Average 75 pre cast panels per day.

Sacred Heart (image)
General Contractor: Turner Construction
Description: In Oregon, 2175 panels

Immunex Bridge (image one, image two, image three)
General Contractor: Skanska
Description: Erection of all Miscellaneous Steel and Pre-Cast Panels. Pre-Cast Panels were set using an engineered trolly system with air tuggers.

Kitsap Credit Union (image)
General Contractor: Opus NW
Description: In Bremerton, WA for Opus NW. Apex erected all precast panels and performed all miscellaneous metal work.
Other Jobs Top of page

 
Cell Tower (image one, image two)
General Contractor: Walker Heavy Equipment
Description: To come later.

BF Goodrich (image one, image two)
General Contractor: BF Goodrich
Description: Temporary shop for 747 engines.

City Transfer, Inc., Maintenance Facility (image)
General Contractor: Tohbak
Description: Re-erection of old building.